N.T.S. Infrastructure (Status: JANUARY 2023)
Existing infrastructure of the National Transmission System (NTS): |
|
Total length: |
13,978 km, of which 183.5 km international transmission pipelines |
Number of compressor stations: |
8 compressor stations (CS Sinca, CS Onesti, CS Silistea, CS Podisor, CS Jupa, CS Bibești, CS Onești M, CS Gherăiești) |
Number of metering regulating stations (MRS) in operation: |
1148 metering regulating stations (1254 meaturing directions) |
Number of valve control stations and/or technological nodes: |
59 valve control stations/technological nodes |
Number of cathodic protection stations: |
1057 cathodic protection stations |
Number of gas odorisation installations: |
1054 gas odorisation installations |
Pipeline diameter: |
between 50 mm and 1200 mm |
Operating pressure: |
between 6 bar and 63 bar |
Interconnections of the NTS with other transmission systems/adjacent system operators: |
|
Total number: |
11 physical cross-border interconnection points, as follows:
|
Interconnections of NTS with LNG terminals/operators of adjacent systems: |
|
|
NA |
Interconnections of NTS with storage facilities/operators of adjacent systems: |
|
Total number: |
6 physical entry/exit points connected to storage facilities as follows:
|
|
These physical entry/exit points are not operated by the TSO. |
Interconnections of NTS with production facilities/producers: |
|
Total number: |
110 physical entry points as follows:
|
|
These entry points are not operated by the TSO. |
Interconnections of NTS with distribution systems/distribution system operators: |
|
Total number: |
916 physical outlets/29 distribution system operators. |
|
These physical exit points are not operated by the TSO. |
Interconnections of NTS with direct consumers/direct consumer type: |
|
Total number: |
235 physical exit points as follows:
|
|
These physical exit points are not operated by the TSO. |
Interconnections between production facilities and distribution systems: |
|
Total number: |
71 physical entry/exit points for direct deliveries of natural gas. |
|
These physical entry/exit points are not operated by the TSO. |
Physical trading centres and virtual trading points: |
|
|
VTP |
Balancing zones: |
|
|
The National Transmission System (without dedicated transit pipelines) is considered a balancing zone. |